WTHD-IR 3k-24

Hybrid solar inverter (off grid inverter); Output power factor PF=1.0; Wide input range of mppt, 12—150Vdc, high power 48V/30A, 48V/50A; Configurable AC/Solar Charger priority via LCD setting; Smart battery charger design for optimized battery performance; Compatible to mains voltage or generator power; Parallel operation with up to 9 units.

Extraction Code:k6wcf4

Key Features:

1.Hybrid solar inverter (off grid inverter); 

2.Output power factor PF=1.0;

3.Wide input range of mppt, 12—150Vdc, high power 48V/30A, 48V/50A;

4.Configurable AC/Solar Charger priority via LCD setting;

5.Smart battery charger design for optimized battery performance;

6.Compatible to mains voltage or generator power;

7.Overload/over temperature/short circuit protection, Fault record, History record;

8.External WIFI devices;

9.Parallel operation with up to 9 units.



规格WTHD-IR.jpg

  • The Lijiang Xiangfan Railway is led out from Lijiang station of Dali Railway, passing Tiger Leaping Gorge and Xiaozhongdian town to Shangri La in the north. The main line is 161 kilometers long. Li Xi...
  • 郑万高速铁路,简称郑万高铁,郑万客专,是郑渝高速铁路(郑州-重庆)的重要组成部分,同时也是联系华北和华中地区和西南地区的主要高速客运通道,兼顾沿线城际及旅游客流运输。 郑万铁路全线建筑长度818公里,估算总投资1180亿元。郑渝铁路全长1063公里,总投资约1500亿元。设计行车速度为350公里/时。通车后,郑州到万州预计5个小时便可到达,郑州到重庆预计6个多小时便可到达。 铁路起于郑州南站,通过...
  • 匈塞铁路,是中国与中东欧国家合作的旗舰项目,是中国与中东欧国家共建“一带一路”的重点项目。项目自匈牙利首都布达佩斯至塞尔维亚首都贝尔格莱德,铁路全长350公里,设计速度200公里/小时,改造既有线并增建二线,形成双线电气化客货共线快速铁路...
  • Yinxi railway is the first railway crossing the hinterland of the Shaanxi Gansu Ningxia revolutionary base area. The main line has a total length of 599.10 kilometers. The line starts from Yinchuan, t...